North Dakota licenses this trade. You need your own North Dakota license before you work here — or one from a state North Dakota accepts.
✓ Verified 21 July 2026 · North Dakota State Electrical Board (NDSEB) · board verified
North Dakota accepts licenses fromAlaska · Arkansas · Colorado · Idaho · Iowa · Maine · Minnesota · Montana · Nebraska · New Hampshire · South Dakota · Utah · Wyoming
North Dakota licenses are accepted inAlaska · Arkansas · Colorado · Idaho · Iowa · Maine · Minnesota · Montana · Nebraska · South Dakota
Apply to reciprocate into North Dakota →
Terms differ — some routes are application-only, others need years of practice. Open “Bringing your license from another state” below for the conditions, and confirm with the board before you travel.
Starting as an apprentice
North Dakota issues an apprentice credential
- What it is called
- Apprentice registration
- Who issues it
- North Dakota State Electrical Board
- Cost
- not published - the board quotes it once your application is confirmed
File your North Dakota apprentice application →
Register within 6 months of employment, and before you start: hours worked before registration do not count.
The master electrician license
Yes - North Dakota issues the Master Electrician license through the North Dakota State Electrical Board. It takes 1 year AND at least 2,000 hours as a licensed journeyman.
- What it is called
- Master Electrician license
- Who issues it
- North Dakota State Electrical Board
- Cost
- $50 application + $50 license
Apply for your North Dakota master license →
Comes in three flavors: Contracting Master, Master of Record, and Non-Contracting Master.
Bringing your license from another state
North Dakota licenses you personally, and it does bring an out-of-state card across by application, with no North Dakota exam to sit — the board's rule is plain that no written test is required for a reciprocal license. The catch is which level carries. A journeyman card transfers in from a fairly wide list of partner states; a master card transfers from only three of them.
So a master coming from a state that isn't one of those three comes in as a journeyman, if at all — check the level, scope, and pay step before you accept the job. Whatever your level, the conditions survive the exam waiver, so read them. You have to have earned your license by passing that state's own written exam — a card you were grandfathered into does not qualify.
It has to be current, active, in good standing, and held continuously for the full year before you apply. And you need documented hours under a contracting master: 8,000 for a journeyman, 10,000 for a master, earned in a state whose licensing and inspection rules look like North Dakota's. If your home state has no continuing-education requirement, you also add proof of a North Dakota-approved eight-hour code class.
Two things will sink an otherwise-good application. If you ever failed North Dakota's own written exam, the reciprocal path is closed to you. And if your apprenticeship skipped the related classroom training and you earned most of your hours right here in North Dakota under a local contractor, the board treats that as a loophole and turns it down.
Here is the trap for a staffing placement: the work-experience section of the reciprocal application wants the electrical contractor named as your employer — the form says in as many words not to list a union or a staffing agency. So if you were placed through an agency, be ready to document the contractor who actually supervised those hours.
The fees are small — $25 to apply as a journeyman and $25 again for the license once it's approved, double that for a master. The board publishes no processing time, and the license card comes by mail only, so confirm the current queue with the board and don't promise a start date off the day you file.
Can you work while it is pending?
No — not on the pending application by itself. North Dakota wants the license in hand before you touch the work, and the board publishes no temporary or provisional permit for someone whose application is still moving. Do not treat a filed reciprocal or exam application as permission to start. There is one bridge written into the law, and you need to understand its limits before you lean on it.
The board may issue a short journeyman permit that lets you work until its next examination meeting — but only on the recommendation of one master and two journeymen who vouch for you by name, and only at the board's discretion. The permit does not renew, its window is weeks rather than months because the board's exam sessions run close together, and the board publishes no form or process for it at all.
Whether it issues these in practice, and whether a reciprocity applicant can even get one — the law is written around the exam track — is not settled. Get the board's answer in writing before you place anyone on it. Don't try to use an apprentice registration as a workaround for a journeyman-level traveler; that is not what it is for.
One honest exception: a handful of jobs need no electrician license at all — utility crews working inside their own system, telecom, cable, and satellite work, an appliance dealer plugging a unit into an existing receptacle, low-voltage power-limited work in a home. Ordinary construction wiring is never inside those carve-outs, so for a traveler on a wiring crew the answer stays: license first.
The exam and the hours
If you are testing rather than transferring a card, the level is set by hours. The journeyman needs 8,000 hours — you can't earn them in under three years — logged while registered as an apprentice under a contracting master, plus your completed apprentice training. A two-year-or-longer electrical school credits 2,000 of those hours.
There are internal caps: at least 4,000 hours have to be hands-on practical work, and repairs, fire-alarm, process-control, and military time each count only up to their own ceiling. Master is one year and at least 2,000 hours worked as a licensed journeyman. Class B — a limited class for farmstead and small-town residential wiring — is 18 months and 3,000 hours.
North Dakota runs its own exam; there is no outside testing vendor. You send the examination application and an employment-verification form to the board as a single PDF, and after it confirms receipt you call to pay the fee. Once the board approves you, it mails an invitation listing the available dates and you pick one — dates run roughly monthly.
The board hands you the code books and a calculator at the exam. You need 70 percent to pass, and the time allowed runs anywhere from about an hour to four and a half depending on the class. Fall short and the wait to retake depends on your score — none if you landed in the sixties, three months in the fifties, six months below that.
The fees are modest: $25 to apply as a journeyman, $50 master, $40 Class B, plus a license fee of the same order once you're approved.
How apprenticing works here
You register with the state board, not just with your employer — this is a real filing, not a formality. You send the apprentice registration application to the board as a single PDF, and it has to be in within six months of the day you start work. The fee is $10 to register and $10 a year to renew. Watch the calendar hard, because this is where hours get lost.
Every registration expires January 31, and renewal opens the prior November 1. Any hours you work while unregistered or lapsed are gone — they do not count toward your journeyman, and there is no way to earn them back. Renew on time, every time. On the job you work under the direct, constant supervision of a North Dakota-licensed electrician, and no electrician may oversee more than three apprentices at once.
You also have to be in a board-approved training track — the standard one is 576 hours of related classroom instruction alongside 8,000 hours on the job, with a shorter program and a two-year-degree route as the alternatives.
The local picture
One statewide license covers every job site in North Dakota. Licensing runs through a single state board, and the law keeps cities out of it. A town can inspect the work within its limits and can adopt a stricter installation code by ordinance, but that ordinance can only be applied to electricians the state board already licenses.
No city or county runs its own electrician license, so there is no local worker card to chase from one town to the next.
If you want to contract for yourself
In North Dakota the individual worker license is the mandatory one. Every person who lays out, installs, alters, or repairs electrical wiring has to hold it, so a traveling electrician cannot be put on a wiring crew without a journeyman, Class B, or master license, or a current supervised apprentice registration. Contracting is a separate layer stacked on top, and it only matters if you bid or sign for the work yourself.
Only a master or a power-limited electrician may enter into an electrical contract — a Class B may contract only for farmstead and one-and-two-family residential work in towns of 2,500 or fewer. Becoming a contractor means an application, proof of at least $500,000 in liability insurance, an orientation, and registering with the Secretary of State.
On top of that, the state's general contractor license from the Secretary of State — its own classes and fees — is required on any job worth more than $4,000, subcontractors included. That is a business credential for the company that runs the job, not a trade license. A W-2 electrician working under a licensed contractor never needs either the contracting status or the Secretary of State license; both are the employer's to carry.
Checked against the state board or statute. Rules change — confirm with the board before you travel or accept work. This is information, not legal advice.