← Todas las ofertas de empleo
Structural Ironworker – Bridge Rehabilitation
Pago$41 / hr
Expected hours/wk50
Dietas$120/day
Expected duration3 a 6 meses
Start dateSep 8, 2026
TipoContrato
Hours, schedule and duration above are the employer’s estimate — not a guarantee. Overtime and job length change with weather, permits, inspections, material delays and client schedules. Get the hours, overtime, duration, pay and per diem you’re actually being offered in writing from the employer before you travel or turn down other work. Términos
Certificaciones requeridas
OSHA 10
Acerca del puesto
Bridge rehabilitation over the river. Structural steel erection, bolt-up, connecting and rigging. Heights work - fall protection certification required.
Inicia sesión para postularte
Postúlate enviando tu currículum de RoadTrades. ¿Eres nuevo aquí? Elabora tu currículum.